Services Projects Recommendations Contacts
Oskol Electrometallurgical Complex JSC
Stary Oskol, 2021

Project Manager:

Maxim Yegorov
Maxim Yegorov
Maxim Yegorov is a project manager, platoon commander in past. Clear, straight, always keeps to the point. Preferences: complex projects and tight-corner situations.

Project in numbers:

70 000 m²
Work site area
3 059 pcs
Quantity of lighting fixtures installed
2021
Project implementation
Oskol Electrometallurgical Combine is a ferrous metallurgy enterprise located near the Stary Oskol city, Belgorod region, the only full-cycle metallurgical enterprise in Russia where the technology of direct reduction of iron and melting in electric furnaces are implemented, allowing to obtain metal practically free of harmful impurities and residual elements. The firstborn of the without blast furnace metallurgy in Russia. It is a part of Alisher Usmanov's Metalloinvest Metallurgical holding.
01
Design works
02
Electrical installation works
03
Supply lighting equipment
04
Services electrical laboratories

The works were carried out at the following sites:

Grade rolling workshop No.1;

Motor transport workshop;

Heat power workshop;
Lime firing workshop;
Pelletizing and Metallization factory;
Pre-production workshop;
Technical Directorate.

Project achievements:

Our specialists have implemented a project to modernize the lighting system using LED technologies. The illumination in the areas is brought into compliance with the norms. Modern Philips LED lamps with resistance to elevated temperatures up to 60-70°C are used in the "hot" areas. The achieved savings of the installed lighting system amounted to 75% of the installed capacity from the original.