Services Projects Recommendations Contacts
Faurecia Automotive Development
Saint-Petersburg, 2020

Project Manager:

Kirill Kozarenko
Kirill Kozarenko
Kirill Kozarenko is a natural-born project manager. Leading energy specialists of the largest enterprises of the Russian Federation speak of him with the most praiseful words.

Project in numbers:

5,500 m²
Work site area
166 pcs.
Quantity of lighting fixtures installed
2020
Project implementation
Faurecia entered the Russian market in 2006. It is on the stage of active development and formation of a team of talented professionals who are proud of their work and ensure the highest quality of their products. With its representative offices in various regions, Faurecia works in close cooperation with its customers, global partners such as Volkswagen, Ford, Renault, Nissan, Peugeot, Citroën, Mitsubishi, GM, Hyundai, Mercedes, and the Russian auto-giant, AutoVAZ. With 6 production sites in Kaluga, Tolyatti, Saint Petersburg, and the Leningrad Oblast, Faurecia keeps working on new programs and projects, entering new territories and introducing the most advanced technologies and methods of production.
01
Design works
02
Electrical installation works
03
Supply lighting equipment
04
Services electrical laboratories

The works were carried out at the following sites:

Production;

Finished product warehouse.

Project achievements:

The challenge before our team was to increase illumination level 3 times from 150 lx to 500 lx without increasing the capacity of the energy generating plant. The budget of the project was very tight. Another complication was a requirement to perform works during production line downtime for the New Year holidays and complete all works before the end of the holidays. Our team fulfilled successfully all the Customer’s requirements. The works were completed in time, the required illumination level was achieved, power consumption remained the same.

The latest high-efficiency lanterns by Philips BY235P LED 200 were used for the project.

The following equipment was used at this facility: