Kirill Kozarenko
Kirill Kozarenko is a natural-born project manager. Leading energy specialists of the largest enterprises of the Russian Federation speak of him with the most praiseful words.

Project in numbers:

15,000 m²
Work site area
547 pcs.
Quantity of lighting fixtures installed
2020
Project implementation
Multon is an innovation company founded in 1995 in Russia for the development and manufacture of fruit-based healthy food: natural juices, nectars, drinks, and mash in aseptic packing..

Multon’s professional team manages one of Eastern Europe’s largest factories located in Shchelkovo near Moscow as well as an own scientific research center. Multon’s products are also produced at Coca-Cola HBC Russia’s factories.
01
Design works
02
Electrical installation works
03
Supply lighting equipment
04
Services electrical laboratories
05
Automated control systems

The works were carried out at the following sites:

Water treatment area;

Blending department;

Laboratory;

Feedstock and material warehouse;

Bottlery;

Personnel’s wardrobe.

Project achievements:

Multon is an old partner of BM-ELECTRO, we completed a lot of joint projects.

This was a complex yet interesting project. First, all electric installation works were performed with the operating production lines; in some areas, we had to perform the installation in three shifts and only when the production lines were stopped for cleaning. On this site, we used all the advanced technologies of Philips in the field of lighting automated control, installed illumination sensors in all areas; the lanterns were dimmed automatically depending on the outdoor illumination level. We managed to ensure the standardized illumination on the working plane at any time of day, individually adjusted for each particular area depending on the production needs.  

In some areas with a large number of windows, lanterns turn off completely during the daytime, except for the duty and emergency lighting. For process areas, we programmed various lighting operation daily scenarios depending on the production needs.

Key indicators: power consumption saving 78%; project payback time did not exceed 3 years; the number of electricians for the lighting system maintenance was decreased due to the full automation..