Services Projects Recommendations Contacts
JTI Petro
Saint-Petersburg, 2016

Project Manager:

Kirill Kozarenko
Kirill Kozarenko
Kirill Kozarenko is a natural-born project manager. Leading energy specialists of the largest enterprises of the Russian Federation speak of him with the most praiseful words.

Project in numbers:

615 m²
Work site area
106 pcs
Quantity of lighting fixtures installed
2016
Project implementation
JTI is a Japanese tobacco company, world's third largest tobacco producer. The largest cigarette producer in Japan (60% of the Japanese tobacco market, according to 2014’s data).
01
Design works
02
Electrical installation works
03
Supply lighting equipment
04
Services electrical laboratories
05
Automated control systems

The works were carried out at the following sites:

Canteen;

Hot and Cold Kitchen.

Project achievements:

The level of professionalism of the engineering team of the JTI Petro group should be noted especially, each person is in his place here and deserves a separate narrative. Our team had a lot to learn! The study of the project was thorough, the timing of the work was scheduled by the minute. The experience of working with JTI Petro subsequently allowed the BM-ELECTRO team to prove itself as an exemplary contractor in the implementation of sufficiently capacious lighting replacement projects at the sites of such production sites as MARS, Henkel, Perfetti Van Melle and other market leaders in their segment. The Dynalight automated lighting control system is used on this project, the lamps are dimmed depending on the intensity level of external light (street light), in the absence of employees in the premises, the light is turned off, with the exception of emergency and duty lighting fixtures. Thanks to automation, savings of more than 70% of the level of previous electricity consumption have been achieved. The light is evenly distributed throughout the room and has a comfortable color temperature of 4000 K. Evaluation of the result of our work by the Customer is excellent!

The following equipment was used at this facility: