Coca-Cola HBC Eurasia
Oryol, 2015

Project Manager:

Kirill Kozarenko
Kirill Kozarenko
Kirill Kozarenko is a natural-born project manager. Leading energy specialists of the largest enterprises of the Russian Federation speak of him with the most praiseful words.

Project in numbers:

21,000 m²
Work site area
299 pcs
Quantity of lighting fixtures installed
2015
Project implementation
The Plant was officially opened in Oryol on August 26, 1996. At that time, only one production line worked. The plant is equipped with three modern production lines to produce beverages for citizens of Oryol, Tula, Kursk, Kaluga, Bryansk, Smolensk, Voronezh, Belgorod, Tambov, and Lipetsk Oblasts.
01
Design works
02
Electrical installation works
03
Supply lighting equipment
04
Services electrical laboratories
05
Automated control systems

The works were carried out at the following sites:

Old finished products warehouse;

Finished tea product warehouse;

Marketing material warehouse;

Feedstock and material warehouse.

Project achievements:

This project is part of the global lighting modernization of fourteen Coca Cola HBC Eurasia factories in Russia. Our team was given the ambitious task of implementing the project in a year and a half, and this is the replacement of about 12,000 pieces of lamps in the conditions of the existing production processes of factories. Part of the BM-ELECTRO team had a protracted business trip from Rostov to Khabarovsk for 1.5 years. We have gained invaluable experience and have once again become convinced of the immensity of our vast country. Working in different regions of Russia, you have the opportunity to communicate with very different people, you better understand how the "aborigine" in the Urals differs from the "aborigine" in the Far Eastern region, and how they do not resemble the indigenous "Southerners" from Rostov. It is because of such projects that you fall in love with your work, and it becomes a part of your life.