Services Projects Recommendations Contacts
Coca-Cola HBC Eurasia
Moscow, 2015

Project Manager:

Maxim Yegorov
Maxim Yegorov
Maxim Yegorov is a project manager, platoon commander in past. Clear, straight, always keeps to the point. Preferences: complex projects and tight-corner situations.

Project in numbers:

2,500 m²
Work site area
638 pcs
Quantity of lighting fixtures installed
2015
Project implementation
Factories of Coca-Cola HBC Eurasia are the largest beverage producers in the Russian Federation. They are located all over Russia: from Vladivostok to the Central Black Earth Region.
01
Design works
02
Electrical installation works
03
Supply lighting equipment
04
Services electrical laboratories

The works were carried out at the following sites:

Production;

Administrative and household building;

Warehouse of finished products.

Project achievements:

This project is part of the global lighting modernization of fourteen Coca Cola HBC Eurasia factories in Russia. Our team was given the ambitious task of implementing the project in a year and a half, and this is the replacement of about 12,000 pieces of lamps in the conditions of the existing production processes of factories. Part of the BM-ELECTRO team had a protracted business trip from Rostov to Khabarovsk for 1.5 years. We have gained invaluable experience and have once again become convinced of the immensity of our vast country. Working in different regions of Russia, you have the opportunity to communicate with very different people, you better understand how the "aborigine" in the Urals differs from the "aborigine" in the Far Eastern region, and how they do not resemble the indigenous "Southerners" from Rostov. It is because of such projects that you fall in love with your work, and it becomes a part of your life.

The following equipment was used at this facility: