Project in numbers:

3,000 m²
Work site area
220 pcs.
Quantity of lighting fixtures installed
2015
Project implementation
The factory in Krasnoyarsk was officially opened on June 26, 1996. The factory provides its beverages to the Krasnoyarsk Krai, Zabaikalskiy Krai, Irkutsk Oblast, Republic of Khakassia, Republic of Tyva, Yakutiya, and Buryatiya.
01
Design works
02
Electrical installation works
03
Supply lighting equipment
04
Services electrical laboratories

The works were carried out at the following sites:

Finished products warehouse;

Bottlery;

Inflation and storage workshop.

Project achievements:

On the projects implemented for Coca-Cola HBC Eurasia, one of the first factories where innovative Philips GreenPerform Highbay G3 lamps were used was a factory in Krasnoyarsk. This lamp is distinguished by a unique cooling system. Thanks to the through cooling fins, dust does not settle on the lamp, respectively, the lamp does not overheat in conditions when the Customer for some reason does not perform appropriate periodic maintenance of the lamps (timely cleaning). This technical solution allows you to save the luminous flux declared by the manufacturer and the service life of the lamp.

The customer appreciated the work of our specialists at a high level, the corresponding letter of recommendation to your attention at the link.