Coca-Cola HBC Eurasia
Yekaterinburg, 2015

Project Manager:

Konstantin Morozov
Konstantin Morozov
Konstantin Morozov is the head of the company. He has been managing projects longer than his memory stretches. A perfectionist.

Project in numbers:

49,100 m²
Work site area
328 pcs
Quantity of lighting fixtures installed
2015
Project implementation
Coca-Cola HBC factory in Yekaterinburg provides its beverages to the Sverdlovsk, Chelyabinsk, Tyumen, Kurgan Oblasts, Perm Krai, Udmurtiya, Khanty-Mansi and Yamalo-Nenets Autonomous Regions.
01
Design works
02
Electrical installation works
03
Supply lighting equipment
04
Services electrical laboratories
05
Automated control systems

The works were carried out at the following sites:

Finished goods warehouse;

Sugar filling area;

Sugar Warehouse;

Materials warehouse;

Building RU-0.4;

FHU;

Compressor;

Boiler room;

Vent chamber;

Summer warehouse No. 1, No. 2;

Auto landing stage.

Project achievements:

At this factory, one of the first in the Russian Federation, advanced and unique at that time Philips BY550X lamps with a built-in motion and light sensor were used. These luminaires are grouped by means of a wireless protocol and adapted to the technological processes at the Customer's site. Each lamp monitors the illumination "under itself" and adjusts to the preset one at any time, depending on the brightness of the external (street) lighting. Also, during the absence of personnel, the lighting in the premises is turned off automatically, with the exception of evacuation lighting. Thanks to technology, it was possible to achieve a record savings rate of about 55%. The illumination indicators at the Customer's site were brought into compliance with the current standards.