Services Projects Recommendations Contacts
Henkel Rus
Dolgoprudniy, 2016

Project Manager:

Maxim Yegorov
Maxim Yegorov
Maxim Yegorov is a project manager, platoon commander in past. Clear, straight, always keeps to the point. Preferences: complex projects and tight-corner situations.

Project in numbers:

5,300 m2
Work site area
92 pcs.
Quantity of lighting fixtures installed
2016
Project implementation
Henkel holds the world’s leading positions due to innovations, brands, and technologies of three business areas: Adhesive Technologies (glues and technologies), Beauty Care, Laundry & Home Care (cleaners and detergents).

Photos of the object after our work:

Henkel Rus
Henkel Rus
Henkel Rus
Henkel Rus
Henkel Rus
Henkel Rus
01
Design works
03
Supply lighting equipment
04
Services electrical laboratories

The works were performed in the following areas:

Finished products warehouse; Re-packing area; Charging room; ADR 3 Storage;

Project achievements:

At this facility, we used BY 698P Green Perform 3 lanterns with trussed cooling ribs, installed Steinel sensor-based automated lighting control system. The overall energy saving of the newly installed lighting system achieved over 60%. This was a pilot project implemented for Henkel Rus company. Afterwards, we completed similar projects on four sites of Henkel Rus company.

The work of our specialists was highly appraised by our customer (you can find the Reference Letter at the link below).