Oskol Electrometallurgical Complex JSC
Stary Oskol, 2018

Project Manager:

Konstantin Morozov
Konstantin Morozov
Konstantin Morozov is the head of the company. He has been managing projects longer than his memory stretches. A perfectionist.

Project in numbers:

70,000 m²
Work site area
3,288 pcs.
Quantity of lighting fixtures installed
2018
Project implementation
The Oskolskiy Electrometallurgical Complex is an ironwork located in the area of Stary Oskol, the Belgorod Oblast. It is the firstling of the direct ore reduction metallurgy in Russia. The plant is a part of Alisher Usmanov’s Metalloinvest Metallurgical Holding.
01
Design works
02
Electrical installation works
03
Supply lighting equipment
04
Services electrical laboratories

The works were carried out at the following sites:

Energy workshop;

Electrical repair workshop;

Long product rolling mill;

Steel sheet finishing;

Mechanical repair workshop;

Steel structure workshop;

Metallurgical equipment repair workshop.

Project achievements:

The illumination in the areas is brought into line with the norms, a lamp with a unique Philips BY698 cooling system is used, due to the use of through ribs, dust does not settle on the lamp body. In the "hot" areas, a 4ME550 lamp with resistance to elevated temperatures up to 70°C was used. The achieved savings of the newly installed lighting system amounted to 75% of the installed capacity from the original. In this project, the achieved level of savings was fixed to the Customer by contractual obligations and confirmed by the installation of metering devices on all lighting cabinets, respectively, the consumption readings of the lighting system were taken before the replacement of the lamps and after – upon their installation. Also, the achieved level of illumination was fixed by contractual obligations for 5 years.

 

The following equipment was used at this facility: