Project in numbers:

10,000 m²
Work site area
120 pcs.
Quantity of lighting fixtures installed
2013
Project implementation
Mikhailovskiy GOK is a Russian producer of iron ore feedstock. It is located in Zheleznogorsk of the Kursk Oblast. The plant is a part of the Metalloinvest Metallurgical Holding.

At this facility, a pilot project of Philips - has been implemented: a small experimental project implemented to discover potential complications and significant factors which may impact the main project and its result.
01
Design works
02
Electrical installation works
03
Supply lighting equipment
04
Services electrical laboratories

The works were carried out at the following sites:

Pelletization plant;

Separation section.

Project achievements:

This project was a pilot project for Metalloinvest enterprises. Philips lamps were installed on the Separation Section, metering devices were installed in the lighting cabinets to record the actual savings and confirm the declared payback period. After the successful implementation of the pilot project, our team gained access to the Customer's sites and began consistent work on replacing the lighting system at the Customer's enterprises. In the period from 2014 to 2017, our team implemented projects to modernize three main Customer sites, these are: Mikhailovsky GOK, Lebedinsky GOK, Oskol Electrometallurgical Combine.