Kyshtym Copper Electrolyte Plant JSC
Chelyabinsk region, Kyshtym, 2022

Project Manager:

Danila Sitnikov
Danila Sitnikov
Danila Sitnikov is a project manager, our key employee. He successfully completed projects in most remote areas of the Russian Federation; his favorite cities are Krasnoyarsk, Irkutsk, Vladivostok, Chelyabinsk.

Project in numbers:

184 000 м²
Work site area
553 pcs
Quantity of lighting fixtures installed
2022
Project implementation
Kyshtym Copper Electrolytic Plant JSC has been a member of the Russian Copper Company (RMK) group since 2003.
KMEZ is one of the oldest metallurgical enterprises in the Urals.

Conducts fire and electrolytic refining of rough copper, processing of copper scrap and waste containing precious metals. It produces copper and precious metals.
01
Design works
02
Electrical installation works
03
Supply lighting equipment
04
Services electrical laboratories
05
Automated control systems

The works were carried out at the following sites:

The object "Technical re-equipment of the CEM. KMEZ JSC :

Copper Electrolysis Workshop;
Electrolysis department;
Warehouse of anodes and anode residues;
The warehouse of cathode copper.

Project achievements:

Implementation of an energy-efficient controlled lighting system on Philips lighting equipment.

The control is implemented on Philips Dynalight equipment with light sensors, controllers and touchscreen panels.