Kirill Kozarenko is a natural-born project manager. Leading energy specialists of the largest enterprises of the Russian Federation speak of him with the most praiseful words.

Project in numbers:

10,000 m²
Work site area
657 pcs
Quantity of lighting fixtures installed
2014
Project implementation
JTI is the largest tobacco producer in Russia, who holds 34.9% of the market (in natural units). Having more than 130 years of history, according to the estimates of the "Expert" magazine, JTI is the largest in volume company in the consumer sector in Russia.
01
Design works
02
Electrical installation works
03
Supply lighting equipment
04
Services electrical laboratories
05
Automated control systems

The works were carried out at the following sites:

Tobacco workshop

Project achievements:

Our specialists have developed and implemented a unique project using motion sensors, illumination, push-button and touch screen lighting control panels by zones in automatic and manual mode. Control signals were transmitted via the DALI protocol using Dynalite controllers. As a result of the modernization of the lighting system, the savings in electricity consumption reached 64%, which is quite a significant achievement for LED lighting technologies in 2013.

 

Since the project was implemented with fully operational production, the work was carried out in accordance with strict timing, the working time in each allocated zone was strictly limited, when the site was launched even 15 minutes late, the tobacco factory suffered losses for non-production. The conditions for compliance with the timing were prescribed by the Customer in the contract, the penalties for non-compliance with the timing were of course enormous for our company.

 

All work was completed on time, without a single violation. The customer appreciated the work of our team at a high level, a letter of recommendation to your attention is available at the link.