Tominskiy GOK
Chelyabinsk, 2019

Project Manager:

Danila Sitnikov
Danila Sitnikov
Danila Sitnikov is a project manager, our key employee. He successfully completed projects in most remote areas of the Russian Federation; his favorite cities are Krasnoyarsk, Irkutsk, Vladivostok, Chelyabinsk.

Project in numbers:

15,000 m²
Work site area
186 pcs.
Quantity of lighting fixtures installed
2019
Project implementation
Russian Copper Company was founded in 2004. Today, RCC is one of the largest copper producers in Russia.

Copper is one of the basic materials for many branches of the world economy. It is used in construction, power, automotive industry, machine engineering, in the manufacture of microprocessors and electronics.

Russian Copper Company is a vertically integrated holding. Production assets of the RCC Group are in the Chelyabinsk, Sverdlovsk, Orenburg, and Novgorod Oblasts, as well as in the Republic of Kazakhstan.

RCC is operating eight mining enterprises, hydrometallurgical complex, three metal plants, and a trading company. They implement a full cycle of production: from extraction and ore refining up to the manufacture and sales of finished products.
01
Design works
02
Electrical installation works
03
Supply lighting equipment
04
Services electrical laboratories

The works were carried out at the following sites:

Main building - section of the flotation department

Project achievements:

The installation of the overhead lighting system is carried out from a bridge crane. Work on this project was carried out in winter, part of the work took place at night due to the total employment of the bridge crane during the daytime by other contractors. In winter, the air temperature at night reached -35°C to -38°C. Conducting construction and installation works at night in the cold at a height of 30 meters is a difficult and dangerous task that requires maximum concentration and professionalism from installers.

Despite the difficult circumstances, all the work was completed on time.

The quality of the work meets the high level of requirements of the RMK company.

The following equipment was used at this facility: